Manufacturing Case Study - Unit Performance
Fiberlok, Inc., Fort Collins, CO

Since the Ice Bear® Systems were installed, they have successfully shifted 10 Tons of cooling while keeping Fiberlok’s manufacturing process up and running as is evidenced in the testimonial below:

“As for costs, we are certainly realizing some energy savings when compared with putting in conventional equipment, but our real savings is in the fact that we have increased our factory up time. Before the systems were installed we could lose as much as two weeks production in the summer – time, capacity that we are able to fully utilize now.

As far as what the systems were designed to do, reducing peak energy demand for business and industrial cooling, I would highly recommend the Ice Energy®product. Installation by the contractor, Air Comfort of Fort Collins CO went very smoothly with no down time in our production. We had some glitches in the start up of the systems, but these were caused by an untimely lightening strike on down line equipment outside our property. These issues were resolved quickly by the Ice Energy®crew and contractor working with our on site staff.”


Learn More:

Operating Environment

System Configuration

Manufacturing Case Study

Hover here, then click toolbar to edit content
 
(877) 5-ICEBEAR (877 542-3232) Email Us