Register  |  Login
Search   
 
Commercial Case Studies
Select a Category:

Auto Dealer

The Ice Bear® 50 system was installed at Power Toyota in Irvine, California on January 7, 2005. this installation displaces 5 Tons of load between 8:00AM and 7:00PM shifting 6 KW of energy from peak to off-peak.
more >>>


Big box retail

Three Ice Bear® 50 systems were installed in a major retail pet supply chain in Victorville, California on November 22, 2005. This installation displaces a total of 17.5 Tons of load between 11:30 AM and 8:00 PM shifting approximately 19 kW of air-conditioning energy from peak to off-peak.
more >>>


Fitness Center

A total of five Ice Bear® 50 systems were installed at Miramont Fitness Center in Fort Collins, Colorado on April 14, 2005. This installation displaces a total of 30.5 Tons of load at times between 11:00 AM and 7:00 PM shifting approximately 35 kW of air-conditioning energy from peak to off-peak.
more >>>


Manufacturing

Two Ice Bear® Systems were installed at Fiberlok’s manufacturing facility on December 29, 2004. Part of Fiberlok’s process requires a special environment for it to work. A 5000 square foot process area needs to be kept at 62 degrees F, 65% RH with 100% make-up air.
more >>>


Restaurant

One Ice Bear® System was installed at a major fast service restaurant chain in Rancho Cucamonga, CA on September 20, 2005. The installation shifts 5 Tons of cooling or approximately 6kW of peak power between 11:30 AM and 7:00 PM.
more >>>


(877) 5-ICEBEAR (877 542-3232) Email Us